Home
COMPANY OVERVIEW
COMPANY OVERVIEW
SERVICES PROVIDED
Environmental Engineering
Brownfields/Voluntary Cleanup Plan (VCUP) Applications/Regulatory Negotiations
Environmental Site Investigations
Remedial Program Implementation
Corrective Action Planning
Construction Management, Demolition, and Site Restoration
Engineering Evaluation/Cost Analysis/Value Engineering
Solid/Industrial/Hazardous Waste Management
Water/Wastewater/Stormwater Treatment System Design and Construction
Facility Environmental Permitting, Site Closure, and Delisting
Health and Safety Planning/Implementation and Oversite
Surface Impoundment Evaluations
ENVIRONMENTAL PROGRAM ASSISTANCE
SERVICES PROVIDED
PROJECTS
FOREST CITY - FITZSIMONS
DENARGO MARKET DEVELOPMENT
VALMONT BUTTE PROJECT
BARTON PROPERTY PROJECT
STAPLETON REDEVELOPMENT PROJECT
GOLD HILL MESA PROJECT
CREEDE FLOODPLAIN PROPERTY
EMPERIUS MILL SITE CLOSURE
PORTER DRAW PROJECT
REFINERY IMPACTED PRIVATE PROPERTY
PRAIRIE GATEWAY DEVELOPMENT
RAIL YARD LOFTS PROJECT
ROSCOE DEVELOPMENT CORPORATION PROPERTY
BRIGHTON FLATS DEVELOPMENT PROJECT
FORMER ANDERSON FORMAL WEAR SITE
RAINBOW CLEANERS PROJECT
WALTON GUN CLUB PROJECT
KANE RANCH PROJECT
ENVIRONMENTAL REVIEW OF 9 GAS STATIONS
PROJECTS
CLIENT REFRENCES
CLIENT REFERENCES
ABOUT US
About Us
CONTACT US
Contact

  Regulatory Agency Links

 STAPLETON REDEVELOPMENT 

Project Name: Stapleton Redevelopment, Denver, Colorado

Date Project Began: March 2000

Date Project Completed: Ongoing

Project Description: 

Casey Resources, Inc. (CRI) is the Environmental Project Manager for Forest City Stapleton, Inc., the master developer of the former Stapleton International Airport.  This is currently the largest Brownfield Redevelopment Project in the country.  The project has required emergency response to contamination discoveries; drum site characterization and remediation; and permit compliance (construction dewatering and stormwater management plan implementation).  For a specific site, CRI also prepared and implemented a Voluntary Cleanup Plan (VCUP).  This plan required CRI to inspect soil for suspect Asbestos Containing Material (ACM); remove asbestos contaminated soil in accordance with a Soil Characterization and Management Plan; remove asbestos containing cement pipe; and prepare a report documenting all soil disturbing activities.  This site was issued a letter of No Further Action (NFA) by the State of Colorado.

 

Type of Contamination: Various contaminants including petroleum and Polynuclear Aromatic Hydrocarbon (PAH) contamination in soils and groundwater. 

Environmental Engineering, Consulting, Remediation, and Management Services

Casey Resources, Inc.
4890 Kipling Street
Wheat Ridge, CO 80033
PH: 303-940-7800
Site Powered By eDirectHost.com
    Learn How To Make A Website